This will allow for expansion and contraction and prevent buckling.
Roof edge metal install.
Do you need to install eave or fascia for a metal roof.
Insert the wide flank of drip cap underneath the first course of shingle or tile all the.
Learn how we can help on your next building project.
You may need to nail through the starter strip into the drip edge.
Install the starter course.
Lay the starter row of metal shingles at the drip edge and affix to the roof with metal roofing nails.
Place a nail at one end then the other.
Omg terminedge is an easy to install ansi spri fm 4435 es 1 tested and fm approved fascia system for virtually any commercial roofing assembly.
Take care the first piece is aligned precisely perpendicular square to the edge.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Place the piece of edging on.
All five terminedge options provide superior protection from wind and water penetration.
Slide the corner tight to the fascia.
4 deep nail the drip edge to the sheathing every 16 if installing multiple runs of drip edge lap them by 1 4 1 2 inch keeping the nail back from the lapped joint.
Here is a short video showing how.
Most metal shingles will be attached to the roof using metal shingle.
Position a piece of 2 by 2 inch metal roof edge at the lower edge of the roof with the beveled side against the.
Perimeter edge metal training and education take advantage of industry leading training and education though care the center for the advancement of roofing excellence.
The extension should be at least inch for it to work.
Install sheet metal drip cap over the lower rim.
Step by step install drip edge on a metal roof build the lower rim of roof extended away from the fascia.
Use your neoprene washer head screws to secure the metal to the sheathing.
Work up from the initial row starting at the lower corner in a diagonal pattern staggering the shingles to prevent gaps.
Metal era manufactures engineered roof edge solutions that are easy to install and stand the test of time.
Be sure to tuck the drip edge under the starter strip and felt paper.
Move the piece as necessary so one end extends 16 inches beyond the lower corner of the roof at one side.
The three piece snap on system helps improve rooftop productivity and offers exceptional performance.
Using drip edge with a nailing edge approx.