L s 221 mid parapet termination 1 reglet.
Roof edge termination.
The 12 inch gravel stop sections were cut at random which allowed the tests.
Allow to flash off.
A 12 inch wide section of 0 062 thic.
Roof edge termination of ballasted or mechanically attached roofing membrane systems.
Soprema counter flashing is designed to provide a watertight termination at the leading edge of the roofing material.
Fold membrane back and apply bonding adhesive to the clean substrate and to the back of the membrane.
Roofkit rubber roofing 10 foot aluminum termination bar is used for edge or vertical wall terminations.
L s 211 parapet termination 1 cap flashing.
The edge termination procedure is the same as above.
L s 203 roof edge termination 3 gravel stop or drainage bar.
File name size date.
L s 201 roof edge termination 1 edge system.
Form a 1 2 minimum radius apply termination tape remove the release paper from the tape fold the rubber over the edge press the rubber firmly into the tape apply caulk to the back of a drip edge termination bar and screw the termination bars through the rubber and tape and into the spacer block.
L s 212 parapet termination 2 coping stone.
L s 202 roof edge termination 2 gutter.
Position membrane to extend over roof edge and down vertical substrate to 1 below roof deck or nailer.
K formed aluminum gravel stop was attached to a pressure treated s p f roof edge mock up utilizing a 0 042 thick reinforced tpo roofing membrane.