Be sure that there are no wrinkles.
Roof felt nailing pattern.
I like to give them a call about any new nailing schedules that i m uncertain about.
Pay careful attention to roll the felt out smoothly avoiding wrinkles as you move across the roof.
Roll out the felt toward the other end of the roof.
This way i don t get chewed out by the building inspector when they show up to inspect that particular.
Most of the time you ll need to contact a local building inspector directly to get a definite answer if it s not already written out for you on the blueprints or manufacturers specifications.
Overlap felt courses at least 4 inches.
Roll out the felt eliminating creases or bubbles and drive at least three staples every foot.
Starting a roof with tarpaper felt.
Snap a chalkline 32 inches above the top edge of the wsu or use the lines on the felt as guides.
Anchor the top corner of the felt after it has been properly positioned and roll the felt out across the roof.
Contact roofhelp 9 18 nailing pattern for roofing felt each row of nails that are 18 on center should be approximately 12 from the outside edge of the roll.
Fasten drip edge on eaves with galvanized nails and a hammer about 12 inches apart before laying roof felt.
If you use the lines as guides for installing shingles measure up from the drip edge to confirm that you stay parallel.
Pull straighten and align the felt along the eaves.
From behind the roll reach over and nail down the top of the strip with roofing nails spaced 6 to 8 inches apart.
Defer putting drip edge on angled gable ends until after the felt is laid so the metal.
This video walks through the very basic steps for installing tarpaper felt.
Nail the middle and bottom of the felt similarly.