While you re at it some carpenters.
Roof framing at top of wall.
The gable ends of the structure want to hold the two ends of the ridge up.
Pry up top plate.
Nail studs to top plate.
Roof framing and 3 adequate connections between the roof structure and the top of the wall to create a complete vertical load path.
Start by marking the plumb line the horizontal line that marks where the wall will meet the rafter.
Most contemporary roof sheathing is either plywood or oriented strand board osb panels.
Add the length of the overhang beyond this mark and.
Ridge beam height above top of slab height of wall z.
Spaced wood sheathing is common for wood shingle roofs.
The xs indicate king studs and double lines indicate cripples.
Detail plates for studs doors windows and intersecting walls.
Measure form the top of this line down the board to determine the line length or length of the rafter less the ridge.
The roof structure consisting of the roof framing roof decking sheathing.
Score the shims with a utility knife and snap them off flush with the plate.
We go over the stu.
Line up the square with the plumb line then rotate it 180 degrees realigning the square on the other side of the.
Portant part of framing.
1 adequately designed and spaced roof framing members 2 adequate lateral bracing to support.
As you shim and plumb each section of wall drive 16d nails through the top plate into the framing with a hammer or nail gun.
From bottom plates to top plates crowning studs and blocking for added rigidity.
Position the square at the end of the rafter board with the tongue on your left and facing away from you.
You should be able.
As the ridge sags down and the centers of the front and rear walls push outwards at the wall top the photo above provides a graphic illustration of direction of the forces at work.
Double plating is most common on load bearing walls unless the roof rafters or trusses and floor joists stack directly over the studs in the wall then a single top plate can be used.
In this video i teach you how to frame a 16 o c.
On center and sandwiched between top and bottom plates.
Fasten the bottom plate by driving 16d nails through it into the floor.
Scatter studs every 16 in.
Once the ridge beam has been positioned in place and supported by roof framing members you can determine the placement of a rafter by measuring down from the top of the beam y height and making a mark on the beam.
The top plate can be either single or double.
A wall is a collection of studs usually sized 2 4 or 2 6 equally spaced usually 16 in.
Tack top and bottom plates in place.
For the length of wall.
For more about this see roof construction basics.
Below is the framing for a gabled roof.
That s why most of the ridge sagging occurs in the center of the roof page top photo.