This template is a free practical and useful tool in creating an audit report for your construction company.
Roof framing checklist.
Are sealed and installed where required.
Be a building work supervisor registered with consumer and business services.
Determine if double studs are face nailed with 10d nails at 24 in.
The roof is complete and exterior moisture barriers are installed.
Permit residential framing checklist approved city stamped plans roof specifications and engineered floor system information is on site and accessible to inspector.
Roof framing inspection checklist 1.
Layout plans truss members connection schedule permanent bracing details dormers roof structures on manufacturer s drawings equipment appliances on man ufacturer s drawings location as per layout alignment bearing spacing connections to bearing points.
A person who completes the checklist must.
Where roof framing work is being undertaken it is a requirement of regulation 74 5 of the development regulations 2008 that a signed checklist be provided to the local council stating that the roof framing has been completed in accordance with the development approval.
The penetrations at top and bottom plates fire blocks soffits ceiling lines etc.
Approved documents which show.
See code section r302 11 for specific locations and approved materials.
Truss roof framing as per design.
30 ways to pass your framing inspections failing your framing inspection can be expensive especially if you have to stop work to fix mistakes and then go backward and.
Determine if continuous headers are toe nailed to studs with 4 8d nails.
Determine if studs are toe nailed to sole plates with at least 3 8d or 2 16d nails.
For all new construction.
Try this framing inspection checklist template from jotform.
In accordance with regulation 74 at least one 1 business day s notice must be given to the council of the intended completion of all roof framing forming part of the building work.
If you are a contractor or an inspector this template will be beneficial for you because it has all the basic information for an inspection checklist.
Locate the grade mark on the rafter to determine species and grade.
Inspect rafter materials and allowable spans r 802 1 r 802 5 tables r 802 5 1 1 r 802 5 1 8 a.
Building is safe and accessible.
Job address is posted in a visible location per irc section r319 1.
R109 4 r703 1 there is no significant moisture remaining in the wood framing.
Wall framing inspection checklist continued m.