Please click on the circled section of the typical building to view its details.
Roof panel construction details.
Panel length per slope that will provide adequate drainage.
Bending and bowing aluminum and steel roofing and siding sheets are rollformed from hardened tempered metal for maximum strength.
Metal roofing specifications cad pdf drawings testing bim.
For longer slopes and lower roof pitches contact fabral for other suitable profiles.
The structural insulated panel association sipa is a non profit trade association representing manufacturers suppliers dealer distributors design professionals and builders committed to providing quality structural insulated panels for all segments of the construction industry.
Take care the first piece is aligned precisely perpendicular square to the edge.
Free delivery with 45 order.
Always begin working at the point with the longest peak to eave distance.
Roof pitch the metal roofing panels shown in this manual require a mini mum slope of 2 per foot to ensure proper drainage.
Also for exposed fastener panels wall panels tiles soffit fascia copping.
Universal ridge flashing in charcoal.
The roofing fascia soffit system shall be installed plumb straight and true to adjacent work.
Project panel corrugated 3 ft.
If a sheet must be bent a gentle 90 degree bend is the maximum recom mended.
Hori zontal panel lap joints are not acceptable.
Box 435 cottonwood mn 56229.
Angle grinder 1 x research source the fastest option.
Refer to the rain carrying table in this booklet for the maximum allowable panel length per slope that will provide adequate drainage.
475 east 4th st.
Add the metal panels.
For longer slopes and lower roof pitches contact fabral for other suitable profiles.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
By amerimax 73 37 63 carton.
Epdm closures and metal top closures shall be caulked around their entire perimeter.
By metal sales.
Allow for a minimum of 18 inches 46 cm if you need to lap to complete the run.
Wear hearing and eye protection.
Most panels come up to 32 feet 9 8 m in length.
Circular saw 2 x research source slower than angle grinder but follow same step 2 pre drill holes on the ridges.
Roof clips shall allow for thermal movement and shall be installed at each panel joint.
Step 1 cut the panels to the desired length.
Some panels have pre drilled holes.