Continue on down the line nailing on both sides and covering the nails with the next shingle tabs.
Roof shingles at peak.
The shingles at the peak of your roof are commonly called cap shingles.
Fiberglass shingles are able to be fully customized and come in a wide variety of shapes and colors.
Install self stick underlayment under the metal flashing.
If your shingles are standard three tab shingles the caps are made by cutting one shingle into three separate parts.
Waterproof your valleys flash the valleys.
A couple of weeks ago we published a two part series showing how a local roofing contractor shingled a roof with architectural shingles.
Overlap the shingles to cover the nails on the side edges and use roofing cement to cover the nail heads on the shingle at the end of the roof.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
If you need more than one flashing in your.
You can either use special shingles called ridge shingles or cut a number of regular shingles into 3 tabbed equal pieces and bend each so they fit snugly on the roof peak and nail them into place.
Use roof tar to hold down the end of the shingle and nail on both sides of the peak making sure that the tabs from the next tile will cover them.
This project guide is a combination of those two articles and it covers replacing the existing roof decking installing underlayment and ice dam protection laying the first row laying shingles in the field flashing ridge shingles and vents and more.
Cut the flashing back to the peak along each crease.
The contractors at peak roofing construction use only the highest quality shingles taking into account the physical aspects of the shingle the matting asphalt and granules as well as the fire rating when making their selections.
Hammer a roofing nail on each side of the shingle five inches from the bottom edges and one inch from the side edge.
Cut the tab off the start shingle so that the edge is smooth and in line with the edge of the roof.
Preparing the peak capping a roof is the last thing done during a roofing project.
Then fold the flashing over the peak.
Fold flashing over the peak.
Many pros shingle in a vertical line up the roof because it s much faster.
It must be completed at the very end of the shingle run to overlap the uppermost shingles and form a weatherproof.
This is an area of the roof which requires extra care and skill.