Systems containing cold adhesive shall be in place not less than 14 days prior to conducting the test.
Roofing adhesive pull test tripod.
If the failure is cohesive the adhesive strength is greater than the cohesive strength.
We do that too.
Anchors and fasteners spray foam vapor barriers other general pull out and adhesion tests.
Fastener pull tests should be performed in accordance to the requirements listed within ansi spri fx 1 standard field test procedure for determining the withdrawal resistance of roofing fasteners.
Our pull testers are commonly used by the roofing and construction industries to evaluate.
Com ten s roofirst pull tester is a valuable solution to test fasteners on the roof.
A standard test method for application and performance of a pull test using the portable adhesion tester is available in astm d4541 iso 4624 and bs en 24624.
It is used to prove the fastening integrity for existing or new roof construction.
Bob fairway roofing painting inc.
1 1 this test method measures the force needed to cause separation of the components of a roofing or a waterproofing membrane system normal perpendicular to the plane of the membrane.
The field adhesion test is simply a hand pull test of a cut area of joint sealant.
It is designed to record and document on site pull out values.
The separation may be adhesive at the weakest bond or cohesive within the weakest material.
The portable adhesion tester may be used to test adhesion for all traffic and nontraffic bearing alt roofing waterproofing and surfacing systems.
It is also a good indicator of the fundamental adhesive properties of a sealant on a particular substrate.
1 6 all testing shall be conducted by an ap proved testing agency and all test reports shall be signed by a registered design professional per f s section 471 or 481 or registered roof consultant.
Introduction the tensile pull off method for adhesion testing as outlined in astm d 4541 and similarly in bs en iso 4624 involves gluing a test dolly to the coated surface and then pulling the dolly by exerting a force perpendicular to the surface in an effort to remove the dolly with the coating from.
Ter roofing work is complete.
The field adhesion test procedure is as follows.
The plywood is then adhered to the smooth roof surface with steep asphalt cold adhesive or a material which is compatible with the roof system.
It can be used in horizontal or vertical tests in all types of substrates.
All pull tests should be documented via pullout test report and provided to firestone.
Do you already have a competitor s pull tester and need calibration or repair services.
The two pieces of plywood are fastened together and attached to the tripod with mechanical fasteners.
Valid adhesion test result is discussed.